Traffic

Click to Interact
Type
Location
Description
Time
incident
I-75Northbound
One lane blocked due to stalled vehicle on I-75 Northbound at Exit 237 GA-331.
incident
GA-74Northbound
Road blocked due to crash on GA-74 Joel Cowan Pkwy Northbound from Kedron Dr to Ardenlee Pkwy.
incident
I-20Eastbound
Right lane blocked due to crash on I-20 Eastbound at Exit 44 GA-6 Thornton Rd.
incident
TN-30Westbound
Right lane blocked due to crash on TN-30 Westbound near County Road 850.
construction
Darlington Drboth ways
Road closed due to major event on Darlington Dr both ways from US-27 to Cave Spring Rd.
incident
I-75Southbound
Two lanes blocked due to crash on I-75 Southbound after Exit 283 Old Allatoona Rd.
incident
Cheshire Bridge Rdboth ways
Road blocked due to incident on Cheshire Bridge Rd both ways between Wellbourne Dr and Woodland Ave.
construction
Fortson Drboth ways
Road closed due to construction work on Fortson Dr both ways between Dudley Dr and Tillman Ln.
construction
Oak Hill Rdboth ways
Closed to commercial vehicles due to new road layout on Oak Hill Rd both ways between Chapel Hill Rd and GA-166.
construction
GA-42both ways
Road closed due to construction work on GA-42 Druid Hills Rd both ways between Druid Hills Dr and GA-13 Buford Hwy. Detour in operation - I-85 northbound to Exit 91, SR 155/Clairmont Road, and then turn onto SR 13/Buford Highway.
construction
GA-400 SSouthbound
Exit ramp from GA-400 Southbound to Glenridge Conn Ne Northbound closed due to construction work. Detour in operation.
construction
I-85 Exit 79Northbound
Exit ramp from I-85 Exit 79 Northbound to 20th Ave Southbound closed due to construction work. Detour in operation - Exit 77/Fob James Dr. or Georgia Exit 2 / GA-18..
construction
I-85Westbound
Entry ramp to I-85 Westbound at Exit 79 from S Broad Ave Southbound closed due to construction work. Detour in operation - Georgia Exit I-85 Exit 2 / GA-18..
construction
Pine Hill Drboth ways
Closed to high sided vehicles due to new road layout on Pine Hill Dr both ways from Cherokee St to Duncan Dr.
construction
Baxter Stboth ways
Single alternate line traffic due to sewer works on Baxter St both ways from Collins Ave to Baxter Dr.
construction
Bankstone Drboth ways
Road closed due to construction on Bankstone Dr both ways from Clintwood Dr to GA-360 Macland Rd.
construction
County Line Rdboth ways
Closed to high sided vehicles on County Line Rd both ways from Riley Rd to Yates Dr.
construction
GA-77-SPURboth ways
Road closed due to construction work on GA-77-SPUR Cokesbury Hwy both ways from Coldwater Creek Rd to Flat Rock Rd.
construction
Weldon Rdboth ways
Road closed due to construction work on Weldon Rd both ways from US-29 to Industrial Rd.
construction
Jenkinsburg Rdboth ways
No through traffic for trucks over eight tons on Jenkinsburg Rd both ways from Jackson Rd to Towaliga River.

mobile apps

Everything you love about 960theref.com and more! Tap on any of the buttons below to download our app.

amazon alexa

Enable our Skill today to listen live at home on your Alexa Devices!